Progress has been slow since a small, "uh oh," happened regarding the cable which runs the piston. Also, while cutting out a step design, an error occurred because the surface it was on while cutting was uneven. Surfacing of the base surface was undergone and the cutting of the step will be redone. These events that occurred were not predicted but the team will roll with the punches and keep moving on.The Elevation team is still on track for May the 4th Ingenuity exhibition.
top of page
Our Recent Posts
Tags
bottom of page